MarCom
Active Working Groups Time Schedule - November 2008
|
Nr: |
Working Group: |
Mentor: |
2003 |
2004 |
2005 |
2006 |
2007 |
2008 |
2009 |
2010 |
2011 |
2012 |
|
47 |
Criteria
for the selection of Breakwater types |
Burcharth |
A |
K |
|
|
|
|
P |
|
|
|
|
48 |
Guidelines
for Port Constructions, related to Bow Thrusters |
Van Damme |
A |
K |
|
|
P |
|
S |
|
|
|
|
49 |
Horizontal
and Vertical Dimensions of Fairways |
Hunter |
|
A |
K |
|
|
|
P |
|
|
|
|
50 |
General
principals for the design of maritime structures |
Hunter |
|
|
A |
K |
|
|
|
P |
|
|
|
51 |
Water
injection dredging |
Van Damme |
|
|
A |
K |
|
|
P |
|
|
|
|
52 |
Criteria
for the (un)loading of containerships |
Hauser |
|
|
A |
K |
|
|
P |
|
|
|
|
53 |
Recommendations
with regard to the design and construction of maritime structures in Tsunami
prone areas |
Katoh |
|
|
A |
K |
|
P |
|
|
|
|
|
54 |
Use of
hydro/meteo information to optimise safe port access |
Hunter |
|
|
|
A |
K |
|
|
P |
|
|
|
55 |
Safety
aspects of berthing operations of oil and gas tankers |
Lundestad |
|
|
|
A |
K |
|
|
P |
|
|
|
56 |
Application
of geotextiles in waterfront protection |
H.J. Verhagen |
|
|
|
A |
K |
|
|
P |
|
|
|
57 |
Stability
of pattern placed revetment elements |
H.J. Verhagen |
|
|
|
A |
K |
|
|
P |
|
|
A = WG approved by ExCom K
= Kick Off Meeting P
= Presentation draft Report in MarCom S
= Send final report to Brussels
Annexe: - MarCom Former Working Groups and
Published Reports
|
MarCom
Former Working Groups and Published Reports:
( ) = PIANC Bulletin number |
|
1.
Underkeel clearance in muddy areas, 1983 (43) |
|
2. The
stability of breakwaters, 1985 (48) |
|
3. Ice
navigation, 1984 (46) |
|
4.
Handling of dangerous goods in ports, 1985 (49) |
|
5.
Underkeel clearance for large ship in maritime fairways with hard
bottom, 1985 (51) |
|
6.
Classification of soils and rocks to be dredged, 1985 (47) |
|
7.
Dimensions and lay-out of one- and two-way channels and fairways (not published) |
|
8.
Damage inflicted by ships with terminals, 1990 (70) |
|
9.
Development of Modern Maritime Terminals, 1987 (56) (out of print) |
|
10. The disposal of dredged materials into
sea, 1986 (52) |
|
11. Port facilities for ferries: practical
guide, 1995 (87) |
|
12. Analysis of rubble mound breakwaters, 1992
(78,79) |
|
13. Floating breakwaters: a practical guide
for design and construction, 1994 (85) |
|
14. Economical channel maintenance methods,
1989 (67) |
|
15. Dry docks, 1988 (63) |
|
16. Specification quantities and related risks
on marine transportation of hazardous chemicals and wastes, 1992 (78,79) |
|
17. Inspection, maintenance and repair of
maritime structures in salt water exposed to material degradation, 1990 (71);
revision WG17 – 2004 (115) |
|
18. Design of fishing ports, 1997 (97) |
|
19. Dredged material, beneficial uses and
underwater disposal, 1992 (76) |
|
20. Capacity simulation models for approach
channels and fairways in harbours, 1992 (77) |
|
21. Flexible revetments in the marine
environment, 1992 (78,79) |
|
22. Armoured slopes
under open piled quay walls, 1997 (96) |
|
23. Site investigation
requirements for dredging works, 2000 (103) |
|
24. Movements of moored ships in harbours,
1995 (88) |
|
25. Coastal Instrumentation, abolished |
|
26. Marine Oil Pollution, abolished |
|
27. Artificial Islands, abolished |
|
28. Breakwaters with vertical and inclined concrete walls, 2003 (113) |
|
29. Recommendations for By-Pass systems for Harbours and Sandy Coasts,
abolished |
|
30a.Approach channels: Preliminary
guidelines, 1995 (87) |
|
30b.Approach channels: A guide for
design, 1997 (95) |
|
31. Life cycle management of port structures,
1998 (99) |
|
32. Port Facilities for High-Speed Ferries, abolished |
|
33. Guidelines for the Design of Fenders Systems, 2002 (111) |
|
34. The effect of earthquakes on port structures, 2001 (106) |
|
35. Dangerous goods in ports, 2001 (105) |
|
36. Catalogue of Prefabricated Elements, 2005
(121) |
|
37. Advances in Maritime Intermodal Freight
Transport, abolished |
|
38. Ice Navigation, abolished |
|
39. Monitoring of breakwaters, abolished |
|
40. State-of-the-art of designing and
constructing berm breakwaters, 2003 (113) |
|
41. High speed ferries at sea and port
approaches, 2003 (114) |
|
44. Accelerated Low Water Corrosion, 2005
(121) |
|
102. Minimising Habour Siltation, Oct. 2008
(133) |
|
103. Life Cycle Management of Port Structures
– Recommended Practice for Implementation, Oct. 2008 (133) |